All Collett & Sons articles – Page 4
-
News
Collett moves ahead with M4 project
Collett & Sons has delivered 120 steel bridge girders from Cleveland Bridge’s factory in Darlington to the M4 smart motorway construction sites in the south east of the UK.
-
News
Collett handles Solwaybank turbines
Collett has begun the delivery of 120 turbine components and accompanying parts from the King George V dock in Glasgow to the Solwaybank wind farm in Dumfries and Galloway, Scotland.
-
News
Collett delivers for Rookery South
Collett & Sons, in collaboration with Karl Gross, transported a 160-tonne turbine and 120-tonne generator from the port of Tilbury to the Rookery South Energy Recovery Facility (ERF) in Bedfordshire, UK.
-
News
Osprey busy with bridge projects
On behalf of Cleveland Bridge, UK-headquartered Osprey has installed several bridges over the M4 motorway in the UK, as part of an ambitious Highways England infrastructure project.
-
From our sponsors
Heavy Lift Awards 2020 shortlist: Overland Transport Provider of the Year
HLPFI takes a look at the finalists for the Overland Transport Provider of the Year category for the Heavy Lift Awards 2020.
-
From our sponsors
Heavy Lift Awards 2020 shortlist: Excellence in Engineering
The HLPFI team reviews the entries that were shortlisted for the Excellence in Engineering award.
-
News
Collett delivers for M4 bridge
UK-based Collett & Sons has delivered nine pairs of girders from the manufacturing facility in Darlington to the M4 Monkey Island Bridge project in the UK.
-
News
Heavy Lift Awards 2020 shortlist revealed
After the first phase of judging by our panel of industry experts, the shortlist has been revealed for the Heavy Lift Awards 2020.
-
News
ESTA publishes best practice guide
ESTA has published best practice guidelines for the safe transportation and erection of onshore wind turbines.
-
News
Collett adds Enerpac lifting system
Collett & Sons has acquired an Enerpac JS-125 multi-point lifting system.
-
News
Collett adds warehousing space in Bradford
UK-based Collett & Sons has added 76,000 sq ft (7,060.6 sq m) of warehousing and office space at its Bradford site.
-
News
Collett transports Newhaven road cargoes
Collett & Sons has delivered the first three 44 m-long paired girders for the Newhaven Port access road project in the UK.
-
News
Heavy Lift Awards: 2019 finalists and winners
HLPFI reviews the 2019 shortlisted and winning entries from the inaugural Heavy Lift Awards.
-
News
Quality support for Clocaenog project
Quality Freight UK, part of the Peel Ports Group, partnered with Collett & Sons to move 27 wind turbines to the Clocaenog Forest project site in Wales.
-
News
Heavy transformers arrive in Sellindge
Collett & Sons has moved two 335-tonne transformers from the port of Dover to a substation in Sellindge, UK on behalf of Daher Projects.
-
News
Collett secures Mansfield work
Mansfield Pollard selected Collett & Sons to transport over 300 specialist handling systems from the manufacturer’s facility in Bedford.
-
News
Collett transports tubes
Collett & Sons has transported four steel tubes 90 miles (144.8 km) from Cleveland Steel & Tubes Depot to Grinton in the Yorkshire Dales.
-
News
Collett moves Big Carl for Hinkley work
Collett & Sons has moved the giant Sarens SGC 250 ring crane to the Hinkley Point C nuclear power plant site in Somerset.
-
News
Collett completes Clocaenog deliveries
UK-based Collett & Sons has delivered 270 out-of-gauge wind turbine components to the Clocaenog Forest wind farm in North Wales.
-
News
Collett in lathe relocation
UK-based Collett & Sons has transported a 55-tonne lathe from the University of Sheffield advanced manufacturing research centre to a nearby site 1.6 km away.