Latest news from Heavy Lift & Project Forwarding International Magazine

Vanguard handles Golden Valley turbines

South Africa’s Vanguard is currently offloading and transporting 48 wind turbines at Port Elizabeth, which are destined for a project site in Golden Valley.

Each turbine consists of three 60 m-long blades, with a combined weight of nearly 450 tonnes.

According to Vanguard, it takes the company just two days to deliver the components to the project site, located 230 km away.

www.vanguard.co.za

Heavy Lift | News

KENC completes engineering scope for Jumbo thumbnail image

KENC completes engineering scope for Jumbo

February 21 - The Netherlands-based KENC Engineering has collaborated with Jumbo to prepare the heavy lift vessel Fairplayer for an FPSO installation project offshore Brazil. 
Views: 362
GS Express handles incinerator cargoes thumbnail image

GS Express handles incinerator cargoes

February 21 - GS Express Logistics has transported two parts of an incinerator from Penang Port to the Langkawi Incinerator plant in Kampung Belanga Pecah, Malaysia. 
Views: 327
Laso begins Alecrim-Urze wind farm project thumbnail image

Laso begins Alecrim-Urze wind farm project

February 20 - Laso Transportes has been tasked with the transport of several wind energy components for the Alecrim-Urze wind farm in Paúl da Serra, on the island of Madeira.
Views: 454

Heavy Lift Across The World

Discover heavy lift and project logistics industry news from around the world by region.