Projects – Page 47
-
News
Colossal lift for Demag duo
Vernazza Autogru has utilised its Demag CC 6800 and CC 3800-1 crawler cranes to lift a 1,050-tonne gantry crane in the Italian province of Massa-Carrara.
-
News
WWPC members tackle Benelux moves
Netherlands-headquartered project specialist Steder Group recently shipped large winches, each weighing more than 110 tonnes.
-
News
Boat lift installed by Sarens
Sarens recently installed a 1,180-tonne boat lift on behalf of client Matière in La Ciotat, France.
-
News
Felbermayr steps up at windy project
Austria’s Felbermayr has been using LR 11000 and LR 1750/2 cranes from Liebherr to erect 30 wind turbines in Burgenland, southeast of Vienna.
-
News
Faymonville helps tree put down new roots
Kraanbedrijf Nederhoff was on hand to relocate a 70-year-old tree in Alphen aan den Rijn in the Netherlands. Heavy-duty trailers from Faymonville, as opposed to a chainsaw, were used to complete the job.
-
News
Van der Vlist handles Komatsu shipment
Van der Vlist has assembled and delivered two Komatsu WA900-8s for BIA Netherlands.
-
News
Jumbo Kinetic on hand for Dos Bocas deliveries
A 1,850-tonne regenerator, measuring 42 m x 15.9 m x 15.2 m, was loaded onboard the heavy lift vessel Jumbo Kinetic for the Dos Bocas refinery project in Mexico.
-
News
Wipfli utilises CombiMAX combination
Switzerland-based Wipfli has used CombiMAX modular vehicles from Faymonville to transport steel cable reels from Romanshorn.
-
News
Berard on the move in Houston
Berard Transport has moved three ship-to-shore (STS) cranes at the port of Houston, USA.
-
News
Thunderbolt calls on PCN members
Thunderbolt Global Logistics, member of the Project Cargo Network (PCN), coordinated the transport of cargoes from Turkey to Seattle, USA.
-
News
C.H. Robinson handles modules
C.H. Robinson handled the shipment of six large modules from a fabricator in Vietnam to Mexico.
-
News
HKZ’s Beta topside installed
Allseas’ Pioneering Spirit has installed the Beta transformer station topside for the Hollandse Kust Zuid (HKZ) offshore wind farm.
-
News
Terra Marique delivers transformer trio
Robert Wynn and Sons has utilised its heavy lift ro-ro barge Terra Marique to deliver three 121-tonne transformers from the Mammoet heavy lift terminal in Schiedam in the port of Rotterdam to Combwich Wharf, UK.
-
News
A magnificent journey with Collett
Collett & Sons has delivered two bridge sections as part of the North Yorkshire Moors Railway’s Yorkshire’s Magnificent Journey project in the UK.
-
News
Bolloré handles Golomoti cargoes
From March to December 2021, Bolloré Logistics Malawi transported solar panels, batteries and equipment for the Golomoti solar project.
-
News
Machinery rolls through Mackay
Höegh Autoliners’ ro-ro vessel Höegh Trigger called at Australia’s port of Mackay to deliver two CAT 797 haul trucks for the Bowen Basin.
-
News
Engineered Rigging equipment used for engine move
During Q4 2021, TIBA Group deployed equipment from Engineered Rigging to move three locomotive engines at Chile’s Terminal Cerros de Valparaíso (TCVAL).
-
News
Allelys on the double in eye-catching move
Allelys has transported a 150-tonne reactor and a 195-tonne transformer in the UK.
-
News
Tschudi supports wind energy projects
Tschudi Group has participated in several offshore wind energy projects spanning the Faroe Islands, Vietnam, and France.
-
News
Total in wind success
Total Movements has moved wind turbine generator components destined for a project in Europe from the supplier’s factory to the load port on India’s east coast.